Daytime Noise Monitoring Results -- Normal weekday
Station M6a, Aegean Terrace
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq * L10 L90
02-Aug-12 10:24 10:54 Sunny 56 57 52 Operation of gantry and mucking N.A Free-field measurement, +3dB correction. 32 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 2656516
08-Aug-12 10:26 10:56 Sunny 58 59 57 Operation of gantry and mucking N.A Free-field measurement, +3dB correction. 31 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 2656516
14-Aug-12 14:31 15:01 Sunny 55 57 52 Operation of excavator  N.A Free-field measurement, +3dB correction. 28 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 2656516
20-Aug-12 10:11 10:41 Sunny 58 59 52 Blasting N.A Free-field measurement, +3dB correction. 30 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 3003246
30-Aug-12 10:16 10:46 Sunny 56 58 52 Rock out N.A Free-field measurement, +3dB correction. 30 <5 B&K 2238   S/N : 2385180 B&K 4231  S/N: 3003246
00-Jan-00 - - - - - - - - - - - - -
      Min. 55                
      Max. 58                
Remark: Free-field measurement, +3dB correction.